PlatformWhy NaqFrameworksPartnersIntegrationsResources

DTAC with Naq

Get your product ready for NHS buyers.

The NHS checks every digital health product against DTAC before buying it. Naq maps the questions for you, fills in the answers from your evidence, and puts it all in one pack.

DTAC with Naq walkthrough video

DTAC with Naq, a three-minute walkthrough of the product · Narrated, with captions

What is DTAC?

DTAC, the Digital Technology Assessment Criteria, is how the NHS checks a digital health product before buying it. The buyer assesses your answers, and there is no certificate.

5 core areas

Clinical safety, data protection, technical security, interoperability, and usability and accessibility.

April 2026

When the refreshed DTAC form, with fewer questions, came into use.

Per product

You answer it for each product you sell to the NHS.

Six steps to an NHS-ready product, most of them done for you.

This is everything DTAC asks of you. For each step, here is what you do and what Naq does.

Step
1

Set it up for your product

You

Create a DTAC instance on your product's scope.

Naq

Maps it for you: 58 questions across seven sections, linked to 34 ready-made controls.

No mapping from scratch
Step
2

Show clinical safety

You

Keep your hazard log, with every hazard rated and approved by your Clinical Safety Officer.

Naq

Uses your hazard log to back your clinical safety answers.

Evidence reused, not rewritten
Step
3

Protect personal data

You

Keep a register of the personal data your product handles, the lawful basis for each use, and how long you hold it.

Naq

Flags any activity that has no lawful basis or retention period.

Gaps found for you
Step
4

Prove technical security

You

Add your Cyber Essentials certificate, penetration test and multi-factor sign-in evidence.

Naq

Lists what the NHS asks for, and shows which items are done.

A clear list, not guesswork
Step
5

Answer every question

You

Answer the questions that still need you.

Naq

Fills in the DTAC form from your evidence. Each answer shows where it came from.

No form filled by hand
Step
6

Send the buyer your evidence

You

Download the DTAC pack when a buyer asks.

Naq

Puts your hazard log, safety case, policies and evidence in one file.

One file to send
Then, send it

Everything the buyer asks for, in one file.

When an NHS buyer asks for your DTAC evidence, download the DTAC pack. It holds your answers and the documents that back them.

DTAC pack
Ready
Your answers and the evidence behind them

Contents

One download

  • Manifest of every question and its answer
  • Hazard log
  • Records of processing
  • Clinical Safety Case Report
  • Policies and evidence files
Built from your latest records when you download it

An example DTAC pack. The contents depend on your own records.

Trust Centre

Show customers, before they ask.

Publish your DTAC controls and documents on your own Trust Centre. NHS buyers answer their own questions before they ask you.

1
Customers filter your controls to DTAC

They see which DTAC controls are in place.

2
They request a restricted document

For example your data protection impact assessment, with their name and the reason they need it.

3
You approve the request

Naq emails them a link straight away, and nothing reaches them until you decide.

58 questions, in 7 sections

  • Company information 12
  • Value proposition 4
  • Clinical safety 8
  • Data protection 8
  • Technical security 7
  • Interoperability 11
  • Usability and accessibility 8

Mapped to the 2026 DTAC form.

34 ready-made controls

  • Clinical Safety Officer Appointment and Competence
  • Hazard Log and Clinical Risk Estimation
  • Clinical Safety Case and Reports
  • DSPT Status
  • Data Protection Impact Assessment
  • Cyber Essentials Certificate
  • External Penetration Testing
  • Interoperability and APIs
  • Published Accessibility Statement

And 25 more.

34 ready-written templates

  • Digital Technology Assessment Criteria (DTAC) Form
  • Clinical Safety Case Report
  • Clinical Risk Management System
  • Data Protection Impact Assessment (DPIA) Procedure
  • Information Security Policy
  • Secure Software Development Policy
  • Vulnerability and Patch Management Policy
  • Privacy Policy
  • Supplier Management Policy

And 25 more.

Every document you link as evidence is also checked automatically: its current version must be approved, staff acknowledgements must be complete, and its review date must not have passed.

Built from the Naq control library for DTAC.

Get ready for DTACwith Naq.

See the six steps in your own workspace, with your own product.